Home / Facilities Management and Scheduled Maintenance
Work gets done under time pressure, at premium rates, by whoever is available, and usually after the damage has spread.
Planned maintenance costs less, is easier to budget, protects the asset value and keeps tenants happy. The reason most buildings run reactively is not that owners do not know this. It is that putting a proper programme in place takes work that nobody has time for.
McBride Construction does that work for you. We survey the building, build a maintenance plan and a forecast budget, agree the rates, then run the programme and handle the reactive work under the same agreement. You get one provider, one schedule, one point of contact and one invoice.
We walk the building or portfolio, record the condition of each element, and identify what needs attention now, what needs attention this year, and what can be planned.
A written plan covering the agreed term, with costs by year. This is the document you take to your board, your body corporate or your budget round.
What happens, when, and who does it. Agreed before the year starts.
Labour rates, callout terms and schedule of rates fixed or indexed for the contract period, so there are no surprises.
The same team, the same rates, the same reporting. You do not need a second provider for the things you cannot plan for.
Completed works, spend against budget, upcoming works and any emerging issues. Formatted for your reporting cycle, not ours.
A named account manager who knows the building and answers the phone.
Paint is the cheapest protection a building has. Left too long, a repaint stops being a presentation job and becomes a repair job: substrate damage, rotten joinery, corroded steelwork and rusted flashings all cost many times what recoating would have. A planned repainting cycle spreads the cost, keeps the building looking maintained and protects what sits underneath.
We survey the building’s exterior, record the condition and remaining life of each coated element, and build a cyclical painting programme with costs by year. Then we deliver it, with our own trades on site and one point of contact through the job.
Schools are the clearest case for cyclical painting. Property funding is allocated in advance and has to be justified, the buildings are often older timber and fibre cement stock that punishes a deferred repaint, and the work has to happen without disrupting teaching. A costed multi-year painting cycle turns an unpredictable request into a planned line in the 10 Year Property Plan.
We work with boards, principals, property managers and project managers on school property, and we understand the constraints that make school painting different from a commercial repaint.
If your school is due for a repaint, or you are building the next 10 Year Property Plan and need realistic numbers, we will walk the site and give you a costed cycle at no charge.
Every commercial building with specified systems needs an annual Building Warrant of Fitness, supported by a compliance schedule and the inspection, maintenance and reporting records behind it. Keeping that paperwork straight across a portfolio is a real administrative burden, and the consequences of getting it wrong sit with the building owner.
McBride works alongside our Independently Qualified Person subcontractors so that the building fabric items on your compliance schedule are inspected, maintained and recorded on time. We coordinate the trades, chase the records and give you a single view of where the building sits.
Your compliance schedule lists the specified systems in your building, and every one of them needs inspection, maintenance and reporting to keep the Building Warrant of Fitness current. We coordinate the Independently Qualified Persons and specialist contractors across the full range of systems, hold the records, and chase the ones who are running late so you do not have to.
We also manage the annual Building Warrant of Fitness sign-off and submission to council, and the six-monthly building evacuation scheme requirements.
Alongside the specified systems, most buildings carry a list of recurring servicing and certification obligations that sit outside the compliance schedule. We fold these into the same annual works calendar so there is one programme, one schedule and one point of contact.
Once the programme is agreed we can fix the annual cost for the term and split it into equal monthly payments. Reactive work is billed separately at contract rates against an agreed annual allowance.
For owners and property managers, that turns an unpredictable line in the budget into a known one and makes forecasting across a portfolio straightforward.
If you manage more than one building, we can run them all under a single agreement or separate agreements, with consistent rates, consistent reporting and one relationship to manage. That includes:
We currently work across Christchurch, wider Canterbury and Timaru, and can service sites further afield under contract arrangements.
Condition survey of every site, asset register, photographic record.
Draft maintenance plan, forecast budget, proposed calendar and rates.
Scope, rates, response standards, reporting format and escalation confirmed.
Site inductions, access arrangements, key handling, tenant notification, systems set up.
Programme runs. First report at the end of month one. Formal review at six months.
Indicative timing for a small to medium portfolio. Larger portfolios are staged.
If you are running a building reactively and would like to know what a planned programme would cost, we will carry out an initial condition walkover and give you an indicative maintenance plan at no charge.
Brock Vuleta, Client and Business Development Manager
Phone 0800 90 90 80 or 021 373 770 · Email brock@mcbrideconstruction.co.nz
Building Christchurch with excellence since 2009
Stay updated with our latest projects and news